+1 (770) 559-4429   info@geosierra.com

 
 

Case Studies PRBs


External Publications and Case Studies for Download

Volatile organic compounds and metals treated by zero valent iron:- VOCs & Metals


    External Publications

            Kelly AFB – Federal Facilities Environmental Journal

 

            Pollution Engineering

 

            Kelly PRB – UPRR

 

            AFCEE Center Views 2004

 

            Tinker Take-Off

 

            Kelly AFB – 34th Street

 

            Kelly AFB – Commercial

 

            Engineering News Record

External Publications
Pollution Engineering
………………………………………………………………………………………………………..
Kelly AFB – Federal Facilities Environmental Journal
…………………………………………………………………………………………………………
Kelly PRB - UPRR
………………………………………………………………………………………………………….
AFCEE Center Views 2004
………………………………………………………………………………………………………….
Tinker Take-off
………………………………………………………………………………………………………….
Kelly AFB – 34th Street
………………………………………………………………………………………………………….
Kelly AFB - Commercial
………………………………………………………………………………………………………….
Engineering News Record
………………………………………………………………………………………………………….
Case Studies
Read our extensive library of papers that detail in depth GeoSierra's design/build services:
Installation and Verification of a ZVI-PRB using Vertical Inclusions to Eliminate Offsite CVOC
Migration
………………………………………………………………………………………………………….
Installation and Verification of a Vertical Hydraulically Fractured ZVI PRB in a Residential Setting
………………………………………………………………………………………………………….
Design, Installation, and Post-Installation Performance Monitoring of a ZVI PRB in a Residential
Neighborhood
………………………………………………………………………………………………………….
Installation of Permeable Reactive Barriers in Urban Residential Environments Surrounding
Federal Installations
………………………………………………………………………………………………………….
Installation of a Full Scale Permeable Reactive Barrier at a Former Manufacturing Site in California
………………………………………………………………………………………………………….
Design, Construction and Installation Verification of a 1200' Long Iron Permeable Reactive Barrier
………………………………………………………………………………………………………….
Groundwater Performance Monitoring of an Iron Permeable Reactive Barrier
………………………………………………………………………………………………………….
Deep Reactive Barriers for Remediation of VOCs and Heavy Metals
………………………………………………………………………………………………………….
Construction and Performance Monitoring of In Situ Reactive Barriers
………………………………………………………………………………………………………….External Publications
Pollution Engineering
………………………………………………………………………………………………………..
Kelly AFB – Federal Facilities Environmental Journal
…………………………………………………………………………………………………………
Kelly PRB - UPRR
………………………………………………………………………………………………………….
AFCEE Center Views 2004
………………………………………………………………………………………………………….
Tinker Take-off
………………………………………………………………………………………………………….
Kelly AFB – 34th Street
………………………………………………………………………………………………………….
Kelly AFB - Commercial
………………………………………………………………………………………………………….
Engineering News Record
………………………………………………………………………………………………………….
Case Studies
Read our extensive library of papers that detail in depth GeoSierra's design/build services:
Installation and Verification of a ZVI-PRB using Vertical Inclusions to Eliminate Offsite CVOC
Migration
………………………………………………………………………………………………………….
Installation and Verification of a Vertical Hydraulically Fractured ZVI PRB in a Residential Setting
………………………………………………………………………………………………………….
Design, Installation, and Post-Installation Performance Monitoring of a ZVI PRB in a Residential
Neighborhood
………………………………………………………………………………………………………….
Installation of Permeable Reactive Barriers in Urban Residential Environments Surrounding
Federal Installations
………………………………………………………………………………………………………….
Installation of a Full Scale Permeable Reactive Barrier at a Former Manufacturing Site in California
………………………………………………………………………………………………………….
Design, Construction and Installation Verification of a 1200' Long Iron Permeable Reactive Barrier
………………………………………………………………………………………………………….
Groundwater Performance Monitoring of an Iron Permeable Reactive Barrier
………………………………………………………………………………………………………….
Deep Reactive Barriers for Remediation of VOCs and Heavy Metals
………………………………………………………………………………………………………….
Construction and Performance Monitoring of In Situ Reactive Barriers
………………………………………………………………………………………………………….

 

 Case Studies

 Read our extensive library of papers that detail in depth GeoSierra's design/build services:

Installation and Verification of a ZVI-PRB using Vertical Inclusions to Eliminate Offsite CVOC Migration

 Installation and Verification of a Vertical Hydraulically Fractured ZVI PRB in a Residential Setting

 Design, Installation, and Post-Installation Performance Monitoring of a ZVI PRB in a Residential Neighborhood

 Installation of Permeable Reactive Barriers in Urban Residential Environments Surrounding Federal Installations

 Installation of a Full Scale Permeable Reactive Barrier at a Former Manufacturing Site in California

 Installation of Permeable Reactive Barrier at Tinker Air Force Base, Oklahoma City, Oklahoma

 Design, Construction and Installation Verification of a 1200' Long Iron Permeable Reactive Barrier

 Groundwater Performance Monitoring of an Iron Permeable Reactive Barrier

 Deep Reactive Barriers for Remediation of VOCs and Heavy Metals

 Construction and Performance Monitoring of In Situ Reactive Barriers


 
 
 
 

© GeoSierra LLC 2021